Industries / Pharmaceutical, Chemical & Life Sciences

Control the environment. Protect the mission.

Pharmaceutical plants, chemical manufacturers, research labs, and production suites where chemicals, controlled spaces, and documentation all matter.

What we see here

Three situations that start the call.

Chemical exposures that need data

Solvents, active ingredients, and process chemicals create exposures that have to be measured, not assumed.

High-risk work inside a live plant

Vessels, reactors, and energized equipment mean confined space entry, lockout, and hot work under permit, often with contractors on site.

Chemicals on a calendar

New Jersey Right to Know surveys, Tier II reports, waste manifests, and safety data sheets all come due. A missed one becomes a finding.

What we do here

Identify. Correct. Educate.

Identify

  • Gap analysis
  • Air and exposure monitoring
  • Respirator fit testing
  • Noise surveys
  • Site audits and mock inspections
  • Fire and life safety assessments
See identify services →

Correct

See correct services →

Educate

See educate services →

We work alongside your process safety team on the parts that touch the floor. Permits, contractor safety, emergency response, and training.

Treo‑EX exercises

Exercise scenarios we build for this site.

Scenario 1

A chemical release in a production area

Scenario 2

Utility loss that affects controlled environments

Scenario 3

Evacuating gowned staff from a cleanroom

Emergency Preparedness & Exercises →

Rules that apply

The requirements behind the work.

NJ Worker and Community Right to Know Act
An annual chemical inventory survey and employee training for covered New Jersey employers.
40 CFR 370, Tier II
An annual hazardous chemical inventory report to state and local emergency planners.
40 CFR 112, SPCC
Sites with more than 1,320 gallons of aboveground oil storage need a spill prevention plan. Smaller qualified facilities can self-certify. Larger sites need a Professional Engineer's certification.
29 CFR 1910.1450
Occupational exposure to hazardous chemicals in laboratories, including a chemical hygiene plan.
29 CFR 1910.28 / 1926.501
Fall protection starts at 4 feet in general industry and 6 feet in construction. Many owners of live sites set one 4-foot rule for everyone, because operations and construction crews work side by side.
29 CFR 1910.134
Respiratory protection, including fit testing for tight-fitting respirators.
29 CFR 1910.1200
Hazard communication, with a written program, labels, safety data sheets, and training.
49 CFR 172.704
DOT hazmat employee training, with recurrent training at least every three years.
29 CFR 1910.120(q)
Emergency response to hazardous substance releases.
Exposure limits
OSHA limits, with the NIOSH recommendation reported where it's stricter. Common exposures here include solvents and process chemicals, and active ingredients with no OSHA limit, benchmarked to the manufacturer's exposure limit or NIOSH occupational exposure banding.
29 CFR 1910.146
Vessels, reactors, tanks, and pits are often permit-required confined spaces under 29 CFR 1910.146, with isolation, atmospheric testing, and a rescue plan before entry.
ISO 45001, 14001, and 9001
Not law, but often a contract requirement. Owners ask contractors and suppliers to show a certified or aligned management system.
Above the floor

Tenet recommends a consistent four-foot fall-protection threshold across mixed operations and construction sites, while addressing task-specific requirements and hazards.

What you get

What you walk away with.

  • Exposure monitoring results
  • Fit test records by worker, respirator, size, and date
  • Written programs that match your rooms and processes
  • DOT and hazard communication training records
  • Audit findings with owners and dates
  • Exercises come with the exercise plan, an after-action report, and an improvement plan with owners and dates
Not sure what you have?

Start with a Gap Analysis.

We compare what applies to your site with what you have on file, and price what it takes to close each gap.

See how it works →
Let's get to work

Know the exposure.
Document the work.

Tell us the site, the processes, and what is due. You get scope, schedule, and price in a written proposal.